Video

Ryan Bridge: $100m later, Auckland's still waiting for a second harbour crossing

18 August 2026

Brief

The most galling part of that was the $50m spent on consultants for Labour's plan to put an almost $1 billion cycling bridge over the harbour.

In-depth

The most galling part of that was the $50m spent on consultants for Labour's plan to put an almost $1 billion cycling bridge over the harbour.

More from NZ Herald